Success Case
Connected Hospital – Papa Giovanni XXIII Hospital in Bergamo
Italy
The Papa Giovanni XXIII Hospital in Bergamo, Italy, has 1,200 beds spread over seven five-storey buildings, each connected to a central building.
The hospital was opened in 2012 and already back then it was considered vital to provide it with connectivity through a multi-operator system of DAS (Distributed Antenna System) and Small Cells to guarantee complete mobile signal coverage to all patients, staff and visitors.
A couple of years later, in 2014, Cellnex expanded the project by also connecting the 270,000 square metres of the auditorium.
In 2020, in the wake of the health crisis that so harshly affected the province of Bergamo, the company began working on the design and installation of a DAS network also on the five floors of building 2, which includes a 10,000 square-metre paediatric ward.
More information: Hospitals connected to the future
Challenges
- 1,404 beds
- Total surface: 135,000 sqm
- Covered surface: 120,000 sqm
Solution
- SISO solution
- 320 antennas
- 7 RUs
Fabrizio Zampoleri
_Head of Telecommunications at the Papa Giovanni XXII Hospital
Latest news
- 13 May 2024
- ·
- Global
Cellnex appoints Ignacio Jiménez Soler as new Director of Public Affairs
- 13 May 2024
- ·
- Sustainability
The Cellnex Foundation successfully completes the third edition of its Cellnex Bridge acceleration programme
- 25 Mar 2024
- ·
- Sustainability
Once again, this year, Cellnex complies with the actions that were planned for 2023 under its ESG Master Plan
- 08 Mar 2024
- ·
- Sustainability
Cellnex recognised by CDP as Supplier Engagement Leader for the third consecutive year